installation and project management.

Elinex specializes in installing and commissioning emergency power systems. Regarding to the location, few locations are too difficult for Elinex and almost everything is possible with regard to horizontal and vertical transport (think of installations in cellars or on the 5th floor which are accessible only by staircase or by crane).

Elinex service engineers are fully qualified to install an electro technical installation according to NEN-1010 standards. In practice, these are the connections between UPS’s, back up generators, battery configurations, bypass switchboards, distribution devices, mains network and applications such as data space, MER, SER or other applications.

implementation. 


After installation, the equipment is commissioned by a factory-certified service engineer. This means that the software is set by the appropriate parameters and then the emergency power system is tested. Once these activities are performed successfully, the completion of the project takes place.

PROJECT MANAGEMENT.

Elinex works with its own project managers who design and deliver complete projects turn-key. These project managers support the implementation of the projects from A to Z. Our project managers are used to working with third parties, such as the local installer.

The activities of our project managers are to guide the delivery, alignment of planning with all parties, the instruction of the Elinex service engineers, maintain contact with all relevant stakeholders, attendance of building meetings and eventually closing and delivering the project.

Return

Contact.

We will gladly contact you to discuss the possibilities for your business.

Sign up for the Elinex newsletter:

16 October 2018 - 08:47 - In de zomer van 2018 is Elinex partner geworden van @DutchDatacenter Huub van Raamsdonk, algemeen directeur Elinex:… https://t.co/TvTt1geKWu
8 October 2018 - 14:36 - Op 25 oktober vindt het IT Infrastructure Datacenters Congress plaats in Affligem, België. Elinex nodigt u van hart… https://t.co/ryETJGeDne
8 October 2018 - 08:54 - 'Machtige multinationals en besluiteloze politici zullen ons stroomtekort niet oplossen' https://t.co/3jsLkk1yHI vi… https://t.co/uoe8jwW2J6
5 October 2018 - 10:41 - Weer grote stroomstoring Schiphol: bagagebanden stil https://t.co/2wq80bpWQe via @telegraaf #watalsdestroomuitvalt
2 October 2018 - 11:04 - Sporten verhoogt de concentratie en productiviteit van medewerkers. De noodstroomspecialisten van Elinex vinden het… https://t.co/v3VheJoRdu
28 September 2018 - 12:02 - Thank you good old Eaton 9130 UPS! From this moment this model is End Of Life. Elinex happily sold more than 10.000… https://t.co/79VutaNa4H
26 September 2018 - 14:36 - Een dag op stap met service engineer Jeroen. Vandaag stond onderhoud van het UPS-systeem bij een instantie in Den H… https://t.co/c8OUZFEdyh
21 September 2018 - 13:42 - Het maintenance team van @Croonwolterdros was gisteren aanwezig voor de 2e UPS-training. In samenwerking met Huawei… https://t.co/zFk9fFmCAQ
21 September 2018 - 09:06 - Waarom is Nederland zo aantrekkelijk voor datacenters? | Blog | https://t.co/bW7L9yX6C2 https://t.co/qgNWPHDoJs
18 September 2018 - 11:30 - Stroomuitval in deel van Rotterdam West Robert Fruinstraat Rotterdam https://t.co/m8WmAkRKmd #watalsdestroomuitvalt
17 September 2018 - 16:31 - Vandaag viert Elinex een feestje! Onze enthousiaste en vrolijke collega Natascha is 12,5 jaar werkzaam bij Elinex.… https://t.co/vjsacJHw9c
11 September 2018 - 10:32 - ‘Succes moet je vieren!’ met dit motto heeft team Elinex haar succes en groei goed gevierd tijdens de jaarlijkse BB… https://t.co/R7VdK5hzCx
3 September 2018 - 14:46 - Elinex heeft ambitie en groeit hard. Vandaag starten 8 getalenteerde mensen die nodig zijn om die ambitie waar te m… https://t.co/4eO4NZuNVn
28 August 2018 - 08:51 - Grieks toeristeneiland zonder stroom - #ndnl #watalsdestroomuitvalt? https://t.co/XJWYwm3k5c
23 August 2018 - 13:43 - En dan denken wij aan Brabant, want daar brandt nog licht! #aggregaat #august #brabant #efteling #etz #guusmeeuwis… https://t.co/UUmIWMoiiD
14 August 2018 - 09:41 - Ons nieuwe teamlid Annelies liep een dagje mee met service engineer Eric. #watalsdestroomuitvalt? https://t.co/uHRIp0r8eq
10 August 2018 - 15:34 - “De vakkundigheid, rust en klantvriendelijkheid van alle medewerkers van Elinex vielen op. Dit is klantbeleving zoa… https://t.co/rjqtF8Mhes
8 August 2018 - 16:44 - Honger niet gestild vanwege stroomstoring in Veenendaal https://t.co/HkvbJLs95v #watalsdestroomuitvalt
7 August 2018 - 16:16 - Vandaag krijgt het maintenance team van @Croonwolterdros een UPS-training van Elinex-projectleider Niid. De aanleid… https://t.co/c7u81uzGv6
3 August 2018 - 09:39 - Stroomstoring in Veenendaal treft ijssalon. #watalsdestroomuitvalt? https://t.co/RqSA48ZcjH